TRANSPARENT STARTING POINTS

Choose your level
of finish.

Flexible construction packages based on current SR pricing, with room to customise for site conditions, design details and interiors.

DEPENDABLE BRANDED MATERIALS AND PRACTICAL FINISHES.

Essential

Rs1,750/ sq. ft.

  • ✓ Branded cement, steel and aggregates
  • ✓ Concealed wiring and branded switches
  • ✓ Quality vitrified flooring
  • ✓ Teak main door and UPVC windows
  • ✓ Double-coat plaster and waterproofing
Estimate Essential build
TOP-TIER MATERIALS, STATEMENT FINISHES AND PREMIUM DETAILING.

Signature

Rs2,100/ sq. ft.

  • ✓ Top-tier structural material selection
  • ✓ Luxury modular and automation provisions
  • ✓ Large-format tiles and designer cladding
  • ✓ Exclusive doors and high-performance windows
  • ✓ Detailed elevation and full-building waterproofing
Estimate Signature build

Rates are indicative for standard construction in Warangal and may vary by design complexity, soil, approvals, site conditions, location, selected finishes and final interior scope.

NOT SURE WHICH FITS?

Start with the feel and finish you want every day.

Every package is a clear starting point. Our team can align specifications, finishes and additions with your priorities.

Talk through the options
FAQ

Understand packages before choosing.

Answers about package rates, inclusions, customization and final project costing.

01What is the difference between Essential, Premium and Signature?

The packages represent different material standards, finish levels and allowances. The detailed scope and selected brands determine which package best matches your priorities.

02Are the displayed package rates final quotations?

No. Package rates are planning references. Final cost depends on drawings, built-up area, soil and site conditions, structure, specifications, location and selected additions.

03What is normally included in a construction package?

A package may cover core civil work, specified materials, electrical and plumbing provisions, waterproofing and selected finishes. Exact inclusions are confirmed in the project scope.

04Can a package be customized?

Yes. Brands, finishes and selected features can be adjusted where practical, with the resulting cost and timeline changes documented before approval.

05Which items may cost extra beyond the package?

Soil-related requirements, approvals, special foundations, compound walls, lifts, premium fixtures, extensive interiors, utilities and design changes may be outside the base package.

START WITH CLARITY

Build with a clear plan, real numbers and one accountable team.

SR Constructions helps you move from site discussion to handover with practical guidance on budget, materials, approvals, timelines and execution.

What happens next

Check a quick budget range, then share your project details for a site-specific consultation in Warangal.

Call Estimator